← Cycles
design · c135activestarted Nov 9Auto draft — not yet reviewed

Component Cleanup

Waiting to be picked uplast activity Nov 10

Next: Phase 0 on Mark's word: the scorecard script and the annotation standard; then the census and its review stop.

Why we did this

Our shared parts box grew fast while we built, and nobody has checked it for doubles, missing labels or thin instructions.

What happened

Every part gets a scorecard against five checks, doubles are merged or retired, and the parts the dashboard built for itself move into the box, so the next app starts with a full one.

New in this cycleEvery shared part gets one line with five checks, so we can see what is clean and what needs work before touching anything.
At a glance
2
changes
1
conversation
8
decisions
0
outside helpers

What changed

The change that matters most, in plain words. Open any one to see it.

  1. 1

    Every shared part gets one line with five checks, so we can see what is clean and what needs work before touching anything.

    The scorecard · came from Mark Parson and Tyler Flintopen →

Also in this cycle
  • When two parts do the same job, there are six set ways to settle it, and each pair gets one. In words

How we got here

Each change, traced back to the conversation it came from. A solid mark means the record names the source; a dashed one was matched by the draft and waits for review.

Someone said
TFTyler FlintNov 5matched · review

“let's strip the data model out, and let's put the new data model in... it would be packaged up into a single Docker file that includes the UI and the Golang app.”

market-analyst /calls/1b21a3ce… (local)
We decided

c135-D1 Groups are cleaned in order of use: ux, then data, then filter, nav and layout, then form, then the domain groups, then icon, typography and prose. — Mark Parson

c135-D2 A duplicate is two components a consumer could swap without the page meaning something else (the 5-question framework's "is it necessary?"). — Mark Parson

c135-D8 The two waiting lists merge into one in the layer repo at Phase 1 and are extracted during Phase 2, each ahead of its group, so the control plane web app (c134) finds them in the layer from its first page. Revised the same day: the consumer to keep green is app.qpoint.io's successor, which starts from a blank slate. — Mark Parson

So now

Every shared part gets one line with five checks, so we can see what is clean and what needs work before touching anything.

Thanks to

People outside Qpoint first. Every thank-you points at something they said or made.

MP
Mark Parson
Qpoint team

Named the five checks and ruled the eight defaults

Set the cleanup in motion from c130 ("clean up our components and tighten up our documentation"), gave the five checks in his order, and ruled D1–D8 on 2026-11-09, revising D8 so the waiting-list extractions happen now for the blank-slate successor app.

TF
Tyler Flint
Qpoint team

Set the control plane the layer must be ready for

His 2026-11-05 decision that the control plane ships as SaaS and self-hosted on a new data model is why the web app starts from a blank slate and why the layer must already hold what it needs (D8).

“let's strip the data model out, and let's put the new data model in... it would be packaged up into a single Docker file that includes the UI and the Golang app.” internal

All images

Every picture from this cycle. Click any one to step through them all.

The pairs

The scorecardNew in this cycle

Everything captured · 1

The full record 8 decisions · 3 key-change entries · 908 words · 1 captures

The record stays as written, for agents and for audit: Key Changes, every decision, the artifacts and the visual record.

Open the record for c135 →