← Cycles
bob-wire · c20activestarted Aug 8Auto draft — not yet reviewed

Build Partner Portal

Park it for nowIt is the wireframe arm of design c62, which is parked waiting on Mark's portal decisions; the review can't usefully happen before those.

Next: Commit the c20 pages in bob-wire. · Park it alongside c62, or close it with the experiment's answer once c62 decides.

last activity Aug 8 · waiting on design c62's parked portal decisions

Why we did this

Qpoint planned a portal for its first build partners. The content was settled, but not the structure: what comes first, and how one page serves an engineer and their boss.

What happened

Two wireframes with real content: a shared portal (now, next and shipped, plus known rough edges) and one partner's page with an Engineering / Leadership switch. The review hasn't happened.

New in this cycleOne page for all partners: what's happening now, next and shipped, then the known rough edges, then how the program works.
At a glance
3
changes
0
conversations
0
decisions
0
outside helpers

What changed

The two changes that matter most, in plain words. Open any one to see it.

  1. 1

    One page for all partners: what's happening now, next and shipped, then the known rough edges, then how the program works.

    The shared portal · came from Mark Parsonopen →

  2. 2

    A sample partner's page tracks their setup in five phases and switches between an engineer's view and a leader's view.

    One partner, two readers · came from Mark Parsonopen →

Also in this cycle
  • The review with Mark, and the findings for the design site, haven't happened; the design site's portal work is parked. In words

How we got here

Each change, traced back to the conversation it came from. A solid mark means the record names the source; a dashed one was matched by the draft and waits for review.

Someone said

From the record: no recorded conversation behind this one.

We decided

No ruling needed: the work itself is the change.

So now

One page for all partners: what's happening now, next and shipped, then the known rough edges, then how the program works.

Someone said

From the record: no recorded conversation behind this one.

We decided

No ruling needed: the work itself is the change.

So now

A sample partner's page tracks their setup in five phases and switches between an engineer's view and a leader's view.

Thanks to

People outside Qpoint first. Every thank-you points at something they said or made.

MP
Mark Parson
Qpoint team

Opened the wireframe arm

The record names Mark only as the reviewer still to come; the cycle folder was committed by Mark Parson (git), and design c62, which this cycle serves, is his. The credit is matched from that.

All images

Every picture from this cycle. Click any one to step through them all.

The pairs

The shared portalNew in this cycle
One partner, two readersNew in this cycle

Everything captured · 5

The full record 0 decisions · 0 key-change entries · 300 words · 3 captures

The record stays as written, for agents and for audit: Key Changes, every decision, the artifacts and the visual record.

Open the record for c20 →

Qpoint Brand Style Guide