The program map
c1302026-11-10Eight cycles and a naming cycle, the four gates between them, and what each waits on.
Source: c130 plan.md (the program map, the gates G1–G4, the Ruling column and the Answers of 2026-11-09); CYCLES.md as of 2026-11-10; the c131 and c137 records for what is done.
The primer, the shape, the gates, the pitch; the record of the roadmap.
kicked off 2026-11-09 · primer (Phase 1) done · next: shape.md and the pitch
A hello app in GPUI Kit, the tray beside the event loop, the three-source nozzle with a fixture plane.
under way in ../qnative since 2026-11-09 · steps 1–3 committed · strobe and CI next
Both apps mapped, a 30-item API gap list, the asks consolidated, what the layer lacks.
done 2026-11-09 · Phases 1–5 wait for Kamal and Tyler's repo decision
The inventory, the bones with ten examples, the ports and controls mocked as three lab pages.
done 2026-11-09 · review stop: ten questions for Mark · Phase 3 with c131, Phase 4 with c134
The layer catalog audited against the five checks, duplicates resolved, every component documented.
no gate · not kicked off · starts on Mark's word
D1–D10 ruled 2026-11-09; shape.md still to be accepted. Opens c131's build and c133.
Tyler's working session, mid-November: the primer, the shape and the spike on the table; Q1–Q12 answered; outcome A or B; c0's shortlist on the agenda.
c131 Phase 5: the app, its patterns doc, the fixture world and the headless tests handed to the engineers. The program's main deliverable.
c134's Phase 4 plan accepted by Tyler and Kamal. Opens the port.
Shell, DataNozzle, the message channel's ports and bones, Status, Inventory, Events, Config, Connect, the tray; packaged for three OSes; handed over at G3.
waits on shape.md (G1) and c0's name · Mark's word
The medium, the token bridge, captures, skills, one worked example: how design mocks GPUI screens.
waited on the primer, done 2026-11-09 · open now, not kicked off
Trigger, lesson, check, record: a finding becomes a lesson and completion becomes proof in the audit log.
waits on c137's bones (done) and a brief in market-analyst · shape ruled (G1)
Time-boxed, categorised, audited access a partner grants Qpoint on their plane: the grant screen and one Status line.
Phase 0 (prior art) may run now · the rest waits on c134's identity decision and Tyler's say on where grants live
The names: the native app, the control plane, the third data source, the two roles, the repo; grounded in the customer's words.
started 2026-11-09 · brief written · Mark's first pass, then the open session with Tyler (on G2's agenda)
c131 Phase 0 as the repo's own cycle: hello app, tray, nozzle, fixture plane.
steps 1–3 committed · strobe measurements and CI next
c130 Phase 2, to be accepted
the session with Tyler
c130 Phase 1, done
open now
done
market-analyst
the identity decision
the V1 slice
the plane side
V1 handed over