Cycle completion audit

2026-10-26, for c124. A recommendation for Mark to rule on. Nothing in CYCLES.md, HISTORY.md or any CYCLE.md was changed.

Every cycle under "## Active" in cycles/CYCLES.md got a verdict: 45 design cycles plus the two cross-repo pointers (www c2, bob-wire c21), 47 in all. Each verdict comes from the status note, the CYCLE.md (whether the Outcome is written and whether the Objective's "done" is met), any PICKUP.md, and the last git touch of the cycle folder. Machine-readable copy: completion-audit.json.

VerdictCount
complete26
close-superseded9
close-abandoned2
park5
keep-active5

If Mark accepts every close, Active drops from 47 to 10 (5 active, 5 parked).

Two notes on dates. Several folders show 2026-09-01 because one bulk "cycle records" commit touched them that day; for c72, c76 and c78 the real work stopped in August. c105 has never been committed, so its date is the file date.

Complete

Objective met, or met in practice. Closing them means writing (or moving) the Outcome and the HISTORY.md entry.

CycleTitleLast activityWhyWhat closing needsConf.
c65Control-Center v22026-08-12Its own Outcome already says the whole arc shipped (research, P1–P17, mocks, layer v0.9.8, qdash).Move the Outcome to HISTORY; note the framework research feeds c123.high
c70Thesis Kindle2026-09-01Its Outcome already says "Complete (2026-08-15)".Move the Outcome to HISTORY.high
c89Teams–Sessions Listings2026-09-18Outcome written; it says it was left active only for Mark to close.Move the Outcome to HISTORY.high
c107qdash Cutover2026-10-02Outcome written: Fable app is crates/qdash/ui, old apps tagged, STORY.md.Move the Outcome to HISTORY. The #713 review is parked by Mark's ruling.high
c88Global Filter2026-09-18Outcome says both phases are done (layer 0.9.13). The leftover app.qpoint.io swap targets an unused app.Strike the app.qpoint.io step; move to HISTORY.high
c80Brotli Stream Termination2026-09-01It waited on the qcontrol fix, which landed on main as PR #714 (5b0b028c2, 2026-09-22).Outcome linking #714; move to HISTORY.high
c99Nuxt Backend Interface2026-10-02Both tracks finished, the report is out, and c107 acted on the decision.Replace "Filled at completion." with the verdict (Fable, cut over in c107).high
c59Inventory2026-08-07Shipped to qcontrol on real data (Iteration 8, layer v0.9.6); Outcome never written.Outcome; move to HISTORY.high
c64Control-Center Consolidation2026-08-11All three deliverables exist and the V5 card shipped (qcontrol 376baabb).Outcome; move to HISTORY.high
c69Operating System2026-08-15All execution done; only its six-cycle decision queue was left, and this audit answers it.Rule c41/c42/c44/c51/c55/c59 from this audit; Outcome; HISTORY.high
c81Phase 1 Pages2026-09-09Done-bar was 17/17 pages on /pages/phase1: met (PR #13), plus the v2 pass.Outcome; HISTORY.high
c90qcontrol Preview2026-09-18All seven pages assembled; c92 then rebuilt them in the real app.Outcome; HISTORY.high
c93Table Column Picker2026-09-27Built, then extracted to the layer through c95 (0.9.22).Outcome; HISTORY.high
c94TODO Execution Process2026-09-25/todos is built and has run four sheets (c92, c102, c103, c110).Outcome; HISTORY.high
c95Trigger-Bar Column Picker2026-09-27DataListingBar shipped across layer, design and qdash (0.9.22).Outcome; Figma and known gaps to backlog; HISTORY.high
c110qdash TODOs — 2026-10-012026-10-02Its one plan was executed and shipped with layer 0.9.31.Outcome; HISTORY.high
c119Logo Downloads2026-10-20Shipped and verified live (d5a1b588b). Outcome empty.Outcome; HISTORY.high
c72Integrations Create & Manage2026-09-01Modal, 11 recipes, detail reuse and persistence built and checked; nothing since.Outcome; check the Fable app kept the modal after c107; HISTORY.medium
c78Fleet Overview Reports2026-09-01Its done-bar is met (chassis, four reports, bake-off, fleet-overview-v3). Only the picks were left, and /fleet moved to c100.Outcome; picks go to c100, reports to c123.medium
c79Finding Lifecycle2026-08-27The goal was to learn by building. The machine, the findings redesign and the qdash port landed; c114/c121 later re-ruled findings.Outcome; list follow-ons as carried to the governance lab.medium
c82Cloud Execution2026-09-02The parked experiment ran: c81 was built in two cloud runs, recorded in first-run-notes.md.Write a short CYCLE.md (none exists); fold in orphan c83; HISTORY.medium
c84Cycles Status Page2026-09-09The design ladder was the objective and M5 was promoted. /cycles then went the c111/c124 way, so the production slice won't happen as written.Finish the Outcome saying so; HISTORY.medium
c92qcontrol New Pages2026-09-27Phases 1–2 and most of 3 landed. Devices was removed (2026-09-25) and c107 replaced that ui.Summary Outcome; mark Device Details dropped; HISTORY.medium
c111Cycles by Week2026-10-05Done-bar met: Week view live, detail promoted to /cycles/weeks.Outcome; hand backfill (Ph 3) and digest rewire (Ph 4) to c124 or backlog.medium
c115Briefs2026-10-21Done-bar was one real brief used by Sarah: the sandbox brief went through to Publish.Outcome; push main; new briefs are content, not cycle work.medium
c121Governance v1 Scope2026-10-26All three waves built and deployed, Outcome and session decisions written; frameworks are c123's.Confirm with Mark; carry "Not done" items to c114/c123; retire the Wave 3 PICKUP.medium

Close as superseded

Later cycles took the work over.

CycleTitleLast activityWhySuperseded byWhat closing needsConf.
c51App Consolidation2026-08-06The umbrella spread into child cycles, and the qdash front-end it wanted now exists.c54, c56, c59, c61, c64, c65, c67, c68, c92, c107Outcome listing the children; objective 4 (docs site) to a seed; objective 5 (cookie consent) points at www c5.high
c67Teams2026-08-15Mark ruled on 2026-09-28 that c100 pulls from these ideas; Teams shipped through c92 and c103.c100, c92, c103Outcome; HISTORY.high
c68Index Overview2026-08-27The landing question went to fleet-overview-v3, Home, and the shipped / index.c78, c100, c109Outcome; HISTORY.high
c41Signal Column Flow2026-05-04The noise-to-explanation ladder moved into the session ladder and session details. Untouched since May.c77, c92Short Outcome; prototype stays at /visualization/signal-column-flow.medium
c42Runtime Session Map Publishing2026-05-04It waited on qmap c24. qmap has moved on to c25–c28, and qmap in the product now lives in c101.c101Outcome: gate never cleared, plan kept as reference.medium
c55Agent Market Definition2026-08-06Personas moved to market-analyst (personas.json was seeded from c55), and the focus is now AI governance.c120 + market-analystOutcome; copy the four open questions to market-analyst.medium
c77Session View2026-08-20Stopped after two mocks; session detail was designed in c90 and shipped by c92.c90, c92Outcome; ladder and fixtures kept as reference.medium
bob-wire c21Inventory + Users / Devices2026-09-01Its three mocks were built here; the pages then went through c81 v2, c90 and c92.c81, c90, c92Commit the folder in bob-wire (untracked there); write its Outcome; drop the pointer here.medium
www c2Brochure Site Q2 Redesign2026-05-20Untouched since May; www c6 folds the qcontrol page into the index.www c6Drop the pointer from design's CYCLES.md; let www close it.low

Close as abandoned

CycleTitleLast activityWhyWhat closing needsConf.
c44Figma AI Dashboard Redesign2026-04-21The Figma-first plan was never followed; the redesign went code-first.Outcome saying so; HISTORY.high
c76Simpler Light/Dark Mode Colors2026-09-01A one-line stage-1 prompt, never kicked off, no CYCLE.md.Drop from Active; log as a seed (or delete).medium

Park

Worth keeping, but not now.

CycleTitleLast activityWhyWhat closing needsConf.
c62Build Partner2026-08-15Portal decisions still wait on Mark; PICKUP.md is good. "Visibility stream active" is stale: it became /partner-digest.Fix the status note; one line in PICKUP; check bob-wire c20 is committed.medium
c100Landing Pages2026-10-02Mocks wait on Mark's picks and a port; governance took priority, and Home moved through c109.PICKUP.md; commit the small CYCLE.md and shot-program edits.medium
c101Qmap Surface2026-09-30The brief has been with the designer since 2026-09-28 with no first round back.PICKUP.md: what the designer owes, open questions, qmap Phase 0.medium
c105Cost Center2026-10-02Round 2 was next on 2026-10-02 and nothing has moved since. The cycle and its mock are uncommitted.Commit the cycle folder and the mock files; PICKUP.md.medium
c8Sharing Design Philosophy2026-03-13Still a good idea, but untouched since March, and the story has changed (c117, c120, c124).PICKUP.md: outline-v1, the open structure question, what changed.medium

Keep active

CycleTitleLast activityWhyNextConf.
c114Governance Phase II2026-10-26The governance umbrella and the lab c118, c121 and c123 build in.Refresh PICKUP.md (still says parked 2026-10-09); update object-model.md.high
c122Early-Stage Documentation2026-10-26Phases 1–2 built; tagging next. Phase 6 is now c124's.Tagging.high
c124Cycle Stories2026-10-26Kicked off today; this audit is part of it.Phase 0 inventory.high
c113qdash Baked Demo2026-10-07One step from done: the scheduled baker waits only on Mark's R2 token.Token → deploy → one bake → close.medium
c117Prometheus2026-10-20Recent, with two pending source tasks and Roesler edits held uncommitted for them.Run the two tasks, commit with the held edits, then close.medium

Record hygiene

Duplicate number

  • c97 has two folders. c97.gen1-origin is in HISTORY.md. c97.harness-chip has only an initial prompt and a plan (2026-09-27), no CYCLE.md, and is in neither index. No harness chip exists in the layer, so it was never built. Renumber it (next free number) and park or seed it.

Listed Active, but the record says done

  • c65 and c70: the Outcome already says complete.
  • c88, c89, c107: the Outcome is written and reads as finished. c89 says outright it was "left active for Mark to close".

Listed Active with no CYCLE.md

  • c76: an initial prompt only.
  • c82: an initial prompt, PICKUP.md and first-run notes.

Folders in neither CYCLES.md nor HISTORY.md (orphans)

  • c14.northwest-passage: one PDF.
  • c34.diagram: diagrams, initial prompt.
  • c36.qcontrol-integration: research v1–v4.
  • c73.help-overlay: a stub prompt.
  • c74.component-pragmatics, c75.cycle-card-extraction: initial prompts only. /cycles now uses CyclesCard; check whether c75 happened inside c111.
  • c83.layer-public: initial prompt. Answered in practice by c82's git-tag install door.
  • c86.machine-status: an empty initial-prompt.md (0 bytes). DataMachine shipped as c91.
  • c123.compliance-frameworks: stage 1, started today, untracked. Expected, but it needs a CYCLES.md line once kicked off.

Each needs a ruling: seed, fold into a closed cycle, or delete.

In both HISTORY and Active

  • None by heading. But another session is moving cycles right now: c120's HISTORY entry and its removal from Active are uncommitted in the working tree, and c116/c118 moved today. Rule on this audit after that session commits, to avoid colliding edits to CYCLES.md and HISTORY.md.

Never committed

  • cycles/c105.cost-center/ and its mock (app/components/cost/, app/data/cost-center-*.ts, app/pages/pages/cost-center.vue).
  • cycles/c123.compliance-frameworks/.
  • bob-wire cycles/c21.inventory/ (in the bob-wire repo).

Stale notes

  • c114 PICKUP.md says parked 2026-10-09, resuming 2026-10-12.
  • c121 PICKUP.md is the Wave 3 hand-off, and Wave 3 is done.
  • c62's status note says "visibility stream active", but nothing has moved since 2026-08-15.
  • c92's status note is a paragraph-long changelog; it should be one line.
  • c66 is closed in HISTORY (into c105), but its CYCLE.md has an uncommitted edit.

Cross-repo pointers

  • www c2 and bob-wire c21 sit in design's Active list. Their own repos' indexes still list them as active too; www lists c1–c6 as active. Design's index should drop both pointers when they close.